4Runner Parts and Accessories
English  


Shrockworks 4Runner Front Bumper 2003-2009 (Custom - Long Lead Time)


Starting at: $1,322.20

Please Choose:













Choose Freight Option:






Now fabricated to accept Baja Designs Squadron lights instead of the 4" PIAA lights. Commonly seen PIAA lights in the first sold bumpers, the new design has been very popular. The lights can be purchased with a bumper in the options below or separately
If you like to play hard in your Toyota 4Runner, it's time for some serious protection. The low hanging plastic factory bumper is easy prey for the rocks and ruts off road. The ShrockWorks 4Runner front bumper is just the ticket to even the odds and allow you to charge ahead with confidence.

Don't waste time with a wimpy brush guard or grill guard for your precious investment. They often cause more damage than they prevent after a hard knock. They are affectionately known as "Damage Multipliers." You can have a great looking bumper that offers real protection and a winch mounting location too.

High quality, well received, and like all ShrockWorks products, it is computer designed in 3D CAD, laser cut and CNC bent.

Remarkably strong, unlike some other bumpers on the market using thin gauge sheet metal less than 1/8" thick, this bumper is made from 3/16", 1/4" and 1" thick plate steel.

Despite its stoutness, painstaking design work on this bumper has kept the weight down to a very reasonable 146 lbs including the front skid plate

Key Bumper features:
- Optimized for off road performance with greatly improved approach angles.
- Hidden winch mount accommodates most non-integrated solenoid winches up to 9500 lbs.
- 3/16" aluminum front skid plate included standard.
- 1" thick recovery points to accept 3/4" clevis shackles
- Integrated mounts for Baja Designs Squadron lights
- Driving light mounting holes on top of bumper - Extremely stiff wraparound wings resist flexing into the body
- Looks great with or without a winch installed. No gaping empty hole where the winch would be. A liscense plate will cover the winch opening. License plate holes are included.
- Designed with clearance in mind for larger tire upgrades.
- Installation is a simple bolt on.


Quick Specs: - 3/16" plate steel bumper
- 1/4" mounting brackets
- 1" thick recovery points
- 2 " and 1.5" high strength tubing
- Splash guards. Covers washer bottle and sheetmetal in that area on both sides, .120" steel.
- Turn signals
- All new hardware included
- Finished in a 3 stage show quality super durable powder coat. No thin peeling off stuff here.


Fits:
Toyota 4Runner 2003 - 2009
We have heard unconfirmed reports from customers that the ARB Bull Bar for the 4Runner does not fit some 2006 or any 2007 4Runners due to changes in the design. Note: The ShrockWorks winch Bumper for the 4th Generation 4Runner has been tested and WILL fit 2006+ 4Runner.


Individually handmade to order
by skilled craftsman in Houston, TX, U S A

  • Model: T4RN4-FBPR01A
  • Manufactured by: Shrockworks

Be the first to write a review.  Write a Review.



More Information

Manufacturer Info

Have you seen ...

Cali Raised LED